![]() ![]() TRACK BARRIER & KERB INSTALLATION WHAT: There will be overnight rolling lane closures for the installation of track barrier and Kerb installation at the following locations and times. daily Sunday, October 15 through Friday, October 20. Koval Lane southbound between Westchester Drive and Rochelle Avenue will experience rolling lane closures and lane reductions, from 9:00 p.m.TRACK LIGHTING INSTALLATION WHAT: There will be overnight rolling lane closures for the installation of track lighting at the following locations and times. Eastbound traffic on Harmon may not turn north onto Audrie Street while the bridge is in place. Eastbound traffic on Harmon Avenue may continue through the intersection or turn right onto Audrie Street for southbound movement.Westbound traffic on Harmon Avenue may not turn onto Audrie Street in either direction and must continue through the intersection.Harmon Avenue at the Audrie Street intersection remains open for eastbound and westbound traffic through the intersection.Southbound traffic on Audrie Street must continue travelling southbound on Audrie Street next to the bridge and must turn right onto Harmon Avenue at the intersection.Audrie Street is also accessible from Tropicana Avenue. The Audrie bridge is accessible for northbound traffic via MGM Road from either Las Vegas Boulevard or Koval Lane.Traffic traveling northbound on Audrie Street may access the bridge and continue travelling northbound over the Harmon intersection via the bridge.English map HERE Spanish map HERE AUDRIE TEMPORARY VEHICULAR BRIDGE OPEN TO PUBLIC TRAFFIC WHAT: The temporary vehicular bridge on Audrie is now open to public vehicular traffic for Traffic traveling northbound on Audrie Street over the Harmon Intersection. Koval Lane northbound and southbound will not experience lane closures and will be open to through traffic. Phase 3: Flamingo Road will experience lane closures both westbound and eastbound beginning at 9:00 p.m.Phase 2: The intersection of Flamingo Road and Koval Lane will experience full closures to traffic in all directions beginning 9:00 p.m.Flamingo Road will be closed to both east and westbound traffic. Phase 1: There will be road closures Flamingo Road west of the Koval Lane intersection to the Westin Hotel entry. ![]() for the installation of the temporary vehicular bridge. through Wednesday, October 25 at 9:00 p.m. TEMPORARY BRIDGE INSTALLATION AT THE INTERSECTION OF FLAMINGO & KOVAL WHERE AND WHEN: The intersection of Flamingo Road and Koval Lane will experience both partial and full road closures beginning Sunday, October 15 at 9:00 p.m. ![]() daily beginning Sunday, October 15 through Wednesday, October 18. There will be lane reductions and alternate lane closures on Koval Lane between Harmon Ave and Rochelle Avenue, from 9:00 p.m. ![]() On Koval lane at the Rochelle intersection. KOVAL LANE TRACK PAVING WHAT: There will be alternating lane closures on Koval Lane at the for final track paving. Please note that the schedule is subject to change. A timeline of road work, track lighting and temporary bridge installations along what will be the Las Vegas Strip Circuit™ in advance of the FORMULA 1 HEINEKEN SILVER LAS VEGAS GRAND PRIX may be found below. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |